Electrical calculators

DC systems

Battery size

Voltage is always editable (12 / 24 / 48 / 110 V and so on). When load is in watts, Ah uses voltage. When load is in amps, Ah is from current and hours; voltage still records the system.

General

Full-load current

General

Three-phase power

IEC / NEMA

Motor current

AC machines

Motor speed

AC machines

Motor torque

IEC 60076

Transformer current

IEC 60909

Transformer fault current

IEC 60034

Generator load current

IEC 60909

Generator fault current

AS/NZS 3008

Voltage drop

Solve for
Circuit

ΔV = I · L · k · Zc / 1000, with k = 2 (1-ph / DC) or √3 (3-ph). Worst-case Zc = √(R² + X²); or R cos φ + X sin φ. AS/NZS 3000 allows 5% from the point of supply, or 7% from a transformer LV terminal. R from Table 35 / IEC 60228 at the conductor temperature.

AS/NZS 3008 · AS/NZS 4777.1

Voltage rise

Inverter
Consumer mains (POS → MSB)
Inverter circuit (MSB → inverter)

AS/NZS 4777.1 typically limits rise at the inverter terminals to 2%. Segment rise uses worst-case |Z| at 75 °C Cu multi-core (Table 35 / Table 30 family).

AS/NZS 3008

Cable size

System
Voltage drop
Cable
Installation

CCC from AS/NZS 3008-style Table 27 (air / ground) with Table 22 grouping and temperature factors. Voltage drop uses Table 35-family R and Table 30-family X. Earth from AS/NZS 3000 Table 5.1. Typical published values — confirm in the Standard for the final design.

AS/NZS 3000 Appendix C

Maximum demand

Diversity follows AS/NZS 3000:2018 Appendix C. Lighting and 10 A sockets on a house use point allowances, not connected-load sums. A double GPO counts as two 10 A socket points.

IEC 60255 / IEEE C37.112

IDMT trip time

IEEE 1584-2002

Arc flash

IEEE 1584-2002 empirical model (208 V–15 kV). Ralph Lee is used above 15 kV or when selected. Typical 2018 gaps and working distances are filled when you change equipment type. Not a substitute for a full IEEE 1584 study.